![]() NOTE: SLOPE FOR WATER TO DRAIN, SHALL BE ACHIEVED BY ADDING MORE WASHERS (ITEM 4) BETWEEN SPACER COUPLINGS (OR TUBINGS) AND FIRE PROTECTION SHEET, IN ONE SIDE OF THE TRAY THROUGHOUT THE LENGTH.ĬABLE CHANNEL TRAPEZE SUPPORT – ASSEMBLY STRUTĬABLE CHANNEL CLAMP ASSEMBLY – (ON WIDE FLANGE)ĬABLE CHANNEL CLAMP ASSEMBLY – (ON CONCRETE BEAM)ĬABLE CHANNEL SUPPORT FROM VERTICAL – STRUCTURAL STEEL ASSEMBLY ![]() NOTE: THE MAXIMUM RATING OR SETTING OF THE AUTOMATIC OVERCURRENT DEVICE FOR CIRCUITS (CONDUCTORS) IN CABLE TRAY IS 500 AMPS FOR A 35mm BONDING PER AND 1000 AMPS FOR A 70mm2 BONDING JUMPER.ĪLUMINUM CABLE TRAY 90 DEGREES – SPLICE PLATE ASSEMBLY AT THE INTERSECTION WITH THE TEMPERATURE LINE, READ DOWN TO THE GAP SETTING.ĪLUMINUM CABLE TRAY HINGED – SPLICE PLATE ASSEMBLY TO DETERMINE THE GAP SETTING, PLOT THE METAL TEMPERATURE AT THE TIME OF INSTALLATION. ![]() DRAW A LINE BETWEEN THE MAXIMUM AND MINIMUM POINTS.Ĥ. PLOT THE LOWEST EXPECTED METAL TEMPERATURE ON THE MINIMUM TEMPERATURE LINE.ģ. PLOT THE HIGHEST EXPECTED METAL TEMPERATURE ON THE MAXIMUM TEMPERATURE LINE.Ģ. ALUMINUM EXPANSION SPLICE PLATE – ASSEMBLYġ.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |